PREGUNTERO

Usuario heldurqimz

Antigüedad: 1 año (desde May 5, 2023)
Tipo: Usuario registrado
Nombre completo:
Ubicación:
Sitio web: https://andreswuph865.jigsy.com/entries/general/hydraulic-roadway-obstacle-hammer-loading-maker-mini-stack-vehicle-driver-china-hydraulic-pile-driver-and-pile-chauffeur
Acerca de mí: A rich cement of cement as well as fine sand with a water-cement ratio of 0.5 is made use of to grout the stack. The grout should have a compressive stamina of a minimum of 480 kg/cm2 on 28 days. A select variety of stacks are load examined to prove the engineering tons style. Mini loading reasons minimal disturbance and also vibration to near various other structures or buildings throughout the setup of them. Keller has large tons examination experience in different rock formations and also the capacity to make internal based upon numerous subsurface problems. " We made use of Purkelly for some immediate work needed on among our building and construction tasks. Their entire technique was extremely expert and the job they accomplished on site was was exceptional. I couldn't advise them extra extremely."

Actividad de heldurqimz

Puntos: 100 puntos (lugar #255)
Preguntas: 0
Respuestas: 0
Comentarios: 0
Ha votado en: 0 preguntas, 0 respuestas
Otorgados: 0 votos positivos, 0 votos negativos
Recibidos: 0 votos positivos, 0 votos negativos

Muro de heldurqimz

Por favor, ingresa o regístrate para publicar en este muro.
...